Line 1: Line 1:
-We're moving to 270 East 1st Ave soon..  we need to get a plan in motion to set the new space up. 
- 
-=== Order of Operations === 
-//Move things in this order// 
- 
-  * Phase 0: Documentation 
-    * Set up webcams on timelapse mode in both locations 
-  * Phase 1: Rough-in, prepare for move 
-    * Create walls for tool room, finish only outside of wall 
-    * Move in nokia desks 
-    * Move in relevant tools (skill saws, hammers, ...) 
-    * Install Lockitron 
-    * Rough in the electrical 
-  * Phase 2: Rough setup 
-    * Hire electrician to install breakers, hook up outlets 
-    * Set up nokia desks 
-    * Start moving in boxes from old space 
-    * Move in CNC and other possessions from storage 
-  * Phase 3: Rest of it. 
-    * Install shelving 
-    * Move everything else 
-    * Party. 
- 
-=== Schedule === 
- 
-Please see the [[https://vancouver.hackspace.ca/wp/events-calendar/|VHS calendar]] for our current move schedule. 
- 
-=== Needs & Wants === 
- 
-== Needs == 
-  * shelves for tote bins 
-  * walls for machine room 
-  * walls for lazzor room 
-  * kitchen space? 
-  * Two rooms (workshop & classroom), maybe a 3rd for the laser and mill.     
-  * (everywhere) Electrical outlets every 6 feet  
-  * (classroom) Projector mounted to the ceiling with all the cabling coming back to a single point.  
-  * (classroom) Speakers mounted on the ceiling with the cabling coming back to a single point.  
-  * (classroom) single long table like we have in the current space.  
-  * (classroom) white board on all the walls. or one big one at the end.  
-      * has anyone worked with the Rustoleum paint-on whiteboard?  Is that an option? 
-  
- 
-== Wants == 
-  * (everywhere) Network Jacks every 6 feet.  
-  * (workshop) Compress air connections along one wall in the workshop area.  
- 
-== Equipment that would make wonderful donations == 
-  * Ladder suitable for use in a room with 13' ceilings 
- 
- 
-=== Stuff that hasn't been categorized yet === 
- 
-Shared Drawing Space (funvill) 
  
outfitting_270_e_1st.1367526422.txt.gz · Last modified: 2015/12/12 14:31 (external edit)

Except where otherwise noted, content on this wiki is licensed under the following license: Public Domain
Public Domain Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki